← Back to Articles

The bathroom is usually the hardest room to renovate. Little space, water, pipes inside the wall, and five tradesmen who have never met. The plumber has left, the tiler comes in a week, the electrician forgot the socket by the mirror. One week turns into a month.

We do it differently. One team takes the bathroom from the first hit of the hammer to the final clean-up. It usually takes 7–14 days.

Bathrooms in microcement and tile
Bathroom finishes: microcement and tile
💬 Send photos and a video of your bathroom
We'll give a preliminary estimate and, if it suits, set up a meeting

Where bathroom renovations usually go wrong

The answer is the right order of work and one person who is responsible for it.

What is included

You don't have to find a plumber, an electrician and a tiler separately. It is one contractor for the whole job.

How long it takes

7–14 days. A small bathroom with simple tiles goes faster. If we replace all the pipes and build a shower area, it takes longer. We give the exact time after we meet, because it depends on the amount of work and can run over or under.

How much a bathroom renovation costs in Israel

An average bathroom (about 7 m² of floor and 28 m² of walls) comes to ₪26,000–39,000. This is how the sum is built up:

Demolition and waste removal₪4,500–6,500
Plumbing: pipes and drainage, 6 points₪9,600–11,000
Toilet preparation₪1,200–1,800
Floor tiling, 7 m²₪1,400–2,800
Wall cladding, 28 m²₪5,600–11,200
Grouting₪800–1,500
Painting₪1,200–1,600
Waterproofing₪2,000–3,000
Total, as a guide₪26,000–39,000

This is a guide for the work. Tiles, fixtures and furniture are counted separately, and their price depends on what you choose. Tiling costs ₪200–400 per m².

What moves the price

We start with a preliminary estimate from photos and a video of the room. After we meet, we prepare the final quote, fix the price in it and sign a contract. For general prices see the article Renovation Cost in Israel: Full Price Guide 2026.

Tiles or microcement

Tiles are reliable and cost less. Microcement gives a smooth surface without joints, so there are no grout lines to darken in the shower. In a bathroom or shower it costs ₪700–900 per m², including materials, labor and a waterproof coating. We learned this technique in Venice. More here: microcement in the bathroom.

A tub can be replaced with a shower

We remove the tub and build a shower area. The shower floor is tiled and made with a drain, so the water runs away instead of standing. The freed-up space can take a cabinet or a washing machine.

Bathroom before and after renovation
Before on top, after below

You can see what such a renovation looks like in the article Before and After: Bathroom Renovation.

Materials

We can order the simple materials ourselves. If you want something individual and are ready to go round the shops, you choose the tiles and fixtures and we install everything.

How the work goes

  1. Photos and video. You send photos and a video of the room and we give a preliminary estimate.
  2. Meeting. If it suits, we meet, look at the space and talk through what you want to change.
  3. Quote and contract. After the meeting we prepare the final quote, fix the price in it and sign a contract.
  4. Demolition. We remove the old and prepare the room.
  5. Utilities. Pipes, connections and electrics.
  6. Waterproofing. We protect the floor and walls from moisture before the tiles.
  7. Tiling. Floor and walls, and a floor with a drain in the shower.
  8. Installation. Fixtures, furniture, mirrors, ceiling and door.
  9. Clean-up and handover. We clean up after ourselves and show you the result.

You talk to Maria about anything to do with the renovation. Vitaly runs the work on site.

"Vitaly is a true professional! Versatile, conscientious, precise! For the first time I felt calm and confident during a renovation. Sincerely recommend!"
Sveta Sigler, apartment renovation

Frequently asked questions

How much does a bathroom renovation cost in Israel?

An average bathroom (about 7 m² of floor and 28 m² of walls) comes to ₪26,000–39,000 for the work. Tiling costs ₪200–400 per m². We start with a preliminary estimate from photos and video. After we meet, we prepare a final quote with the price fixed in it.

How long does a bathroom renovation take?

Usually 7–14 days. It depends on the amount of work and can run a little over or under.

Can you remove the bathtub and build a shower?

Yes. We remove the tub and build a shower area. The shower floor is tiled and made with a drain.

Do you order the tiles and fixtures, or do I?

We can order the simple materials ourselves. If you want something individual, you choose the tiles and fixtures and we install everything.

Which areas do you work in?

Ra'anana, the Sharon region and the Tel Aviv area.

Is the price in the quote fixed?

Yes. After the meeting we prepare the final quote and fix the price in it. Then we sign a contract and start work.

Want to update your bathroom?

Send photos and a video of your bathroom. We'll give you a preliminary estimate. If it suits, we meet, and after the meeting we prepare a final quote with a fixed price.

Maria, 052-545-27-19

More about the services: Bathroom renovation, Tile installation

💬 Message us on WhatsApp