← Back to Articles

The old bathroom had small beige tiles on the floor and walls, a countertop tiled in the same way, a cabinet with knobs instead of handles and two separate taps. After the renovation it has grey walls, wall-hung furniture and soft light.

Bathroom before and after renovation
Before on top, after below

What it was like

The grout lines had darkened, the walls were stained and the tiles looked worn out. A tiled countertop collects dirt in every joint and can't really be cleaned any more. The cabinet stood on the floor, so there was no way to wash underneath it.

What it looks like now

The window with the blinds stayed as it was.

💬 Send a photo of your bathroom
We'll take a look and tell you what is possible

How a job like this goes

The order is always the same:

  1. Photos and a video of the room, a preliminary estimate, then a meeting.
  2. A final quote with a fixed price and a contract.
  3. Demolition of the old tiles, furniture and fixtures.
  4. Pipes, connections and electrics.
  5. Waterproofing and preparing the base.
  6. Tiles on the floor and walls.
  7. Installing the fixtures, furniture, mirror and lights.
  8. Cleaning up and handover.

We plan the sockets by the mirror and the backlight before the tiling. If you think of them afterwards, a finished wall has to be cut open.

Materials

We can order the simple materials ourselves. If you want something individual, you choose the tiles and fixtures and we install everything.

Time and price

A bathroom usually takes 7–14 days, depending on the amount of work. Tiling costs 200–400 ₪ per m². We give a preliminary estimate from photos and video, and a final quote with a fixed price after we meet. For a general idea, see the article "Renovation Cost in Israel: Full Price Guide 2026".

Planning a bathroom renovation in the Sharon region?

Send me a photo of your bathroom and I'll take it from there.

Maria, 052-545-27-19

More about the services: Bathroom renovation, Tile installation

💬 Message us on WhatsApp